Geotube® Mine Wastewater Management at MMG Gold Mine, Tasmania
Geotube® Dewatering and Containment for Rare Earth Processing Residue.
Cleanout of Coal Mine Settling Ponds using Geotube® Dewatering Technology
Geotube® Dewatering and Containment of Gypsum Wastes at a Titanium Dioxide Plant.
Learn how the expertise of the TenCate Geotube® dewatering specialists turns the problem in a solution
Geotube® dewatering and containment technology was selected to beneficially reuse the wasted tailings to build a series of dams to prevent potential long term problems at this site.
The Wheelabrator facility located in Lisbon, CT utilizes a storage tank for collection of scrubber water resulting from the incineration of trash and wood.
Many states are faced with the problem of dealing with tailings and residues from mining, road building, and other sources that pose a threat to groundwater.
Lunda Construction was subcontracted by Michels Corporation to drill 35 foot diameter down-shafts to facilitate the installation of a pipeline between the Manitowoc River and the Fox River in De Pere.
Faced with full water-storage basins, Europe’s largest nickel mine at Talvivaara, Finland, was challenged once more in 2012 when a tailings pond containing gypsum sediment began leaking.